Most sheet pile retaining walls need supplementary support at the top and the deeper the pit or longer the piles 2 or 3 levels installed, in addition to the embedment in the soil.

Temporary cofferdams generally use walers and struts to cross-brace the inside excavation. Permanent or large retaining walls are often tied back to an anchor wall using smaller sheets or concrete blocks installed at a certain distance behind the wall

CONTACT

Inquiries

For any inquiries, questions or commendations, please call: (617) 481-5566 or fill out the following form

Contact Us

Get a quote: 617 481-5566

Head Office

299 Water Street
Quincy, MA 02169

 

info@ack-marinecontracting.com

Tel: (617) 481-5566

Fax: (617) 481-5651

Employment

To apply for a job with ACK Marine Contracting, please send a cover letter together with your C.V.

to: jobs@ack-marinecontracting.com

Bracing, Tie Rods, & Anchors

bottom of page