Cross Bracing
The Support you need
Most sheet pile retaining walls need supplementary support at the top and the deeper the pit or longer the piles 2 or 3 levels installed, in addition to the embedment in the soil.
Temporary cofferdams generally use walers and struts to cross-brace the inside excavation. Permanent or large retaining walls are often tied back to an anchor wall using smaller sheets or concrete blocks installed at a certain distance behind the wall